Installation, Testing and Commissioning
- Pin Brazing
- Deep Well Ground Bed Drilling
- Installation of All CP Materials
- Commissioning of ICCP/SACP System
- Holiday Testing at CP Cable Connection
- Installation of AC Mitigation Materials
- Troubleshooting of Transformer Rectifier
- Installation of Earthing Isolation Devices
- Auguring for Distributed Canister Anode Installation
- Angular Drilling for Anode Installation Under Existing Tank Bottom
- Installation of Marine SACP and ICCP Anodes for Offshore Structures and Piles